Exfo IQS-12004B DWDM Passive Component Test System for Manuel d'utilisateur Page 141

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 437
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 140
Testing Multiple DUTs with the LabVIEW Application
DWDM Passive Component Test System 129
Performing Reference Measurements
Performing Reference Measurements
Once the calibration is complete, you will have to perform reference
measurements. More detailed information about references can be found
in Performing Reference Measurements on page 82.
The dialog box can be divided into four main parts:
³ A section that specifies the types of reference measurements that can
be performed on the system: IL, IL/PDL, ORL
³ A monitoring zone that allows you to verify the power read from the
power meter, in dBm
³ A connection information section that indicates to which switch port
and to which power meter channel the fiber should be connected
³ A section that displays useful instructions about reference
measurements
Power meter monitoring
zone
Connection information
Instructions
Types of
references
Vue de la page 140
1 2 ... 136 137 138 139 140 141 142 143 144 145 146 ... 436 437

Commentaires sur ces manuels

Pas de commentaire